The Port of Esbjerg has got a beautiful new building, a work tent of 2000m2 from O.B.Wiik.
The building, which has been set up for Ziton A/S, will be used for renovation and service of wind turbine blades for the offshore wind turbines. With 20×100 meters, you get space for 3 wings at the same time, as well as space for an integrated bearing and spare parts.
A big advantage of the tent hall is that it can be placed where needed. In this case, it means great logistical advantages so that you do not have to carry the large wind turbine blades further after they have come ashore. The work at the port is already in full swing and will last for 10 months.